INDUSTRIAL

PORT BOTANY

This project required SBM to conduct investigation works to assess the extent of corrosion to reinforcements and concrete slabs. SBM engaged in concrete scrabbling from soffit of the slabs to determine the magnitude of corrosion. Existing features including concrete slabs and railings were removed and repairs and releveling of all concrete was carried out.  

Previous
Previous

NORTH BONDI

Next
Next

ROSEBAY